WIFI WIFI Everywhere and Not a Drop to Drink

On an extremely compressed time-table we were able to setup a security camera and 5 Cisco WAPs so the IT team could come in behind us.

A tenant was moving into an office and they needed some telco work completed before the setup team arrived. We were able to turn around a quote the next day, order material, and rearrange our schedule to complete the job. It was completed in under a week and in time for the setup team.


We ran plenum rated CAT 6 from the patch panel to a security camera and 5 WIFI access points (WAPs). We terminated and tested the cables and made sure to label everything: hardware, cables, and ports. To add a cherry on top, we sent a complete roll-up of our work to the IT team so they knew what they were dealing with on Monday morning.


Every project has a challenge or two. The challenge can be the size of the project, a technical challenge, or simply the weather, just to list a few examples. This project's challenge was the timeline. However, this client is a great customer that we work with frequently, so we worked to make it happen.


We say it on our home page, "Your electric partner". This is an example of why relationships matter and having a reliable, fair, and trustworthy go-to electrician matters.

Project Gallery


Share:
 

Emloh Electric

41950 Samuel Street Elyria, Ohio 44035

OH License:  50518

Call Today:  (440) 785 - 8948

WV License: WV063418 / M2311001130
  • Facebook

Follow Us On Social Media

bottom of page